- Version
- Download 219
- File Size 253.32 KB
- File Count 1
- Create Date Jun 25, 2021
- Last Updated Jun 28, 2021
Tender BSM79 21 CONSTRUCTION OF NEW DISTILLERY ROAD BRIDGE, REHABILITATION, ROADWAYS AND ANCILLARY WORKS
A compulsory virtual clarification Meeting will be held on Wednesday, 7 July 2021 at 10h30 and will be held via Microsoft Teams. Tenderers must ensure to download the App and give the municipality the necessary email address and cell phone number to Gaelen.Wright@aecom.com at least 48 hours prior to the meeting (05 July 2021 at 10h30) to enable the department to setup a virtual meeting.
Local production and content is applicable to this bid. Bidders must use the exchange rate published by the South African Reserve Bank (SARB) at 12:00 on Saturday, 26 June 2021. The guidance document for the calculation of local content is included in the bid document and is also available on the municipality’s website by following the Supply Chain Management link. If raw material or input to be used for a specific item is not available locally, bidders should obtain written authorisation from the DTI should there be a need to import such raw material or input. A copy of the authorisation letter must be submitted together with this tender document at the closing date and time of bid. Please note that the requirements in terms of local production and content are fully contained in the tender document.
Tender documents is available as from Wednesday ,30 June 2021 at the Consultant upon payment of a non-refundable fee of R1 000.00 per document.
Attached Files
File | |
---|---|
Tender BSM79 21 Upgrade oF Distillery Bridge Adverts and Guidance Docurment for local content.pdf |