TENDER BSM 63/22: ENGINEERING, PROCUREMENT AND CONSTRUCTION OF CONTAINERIZED BATTERY ENERGY STORAGE AND GRID INTERACTIVE INVERTER SYSTEM AT THE STELLENBOSCH FIRE STATION

CLOSING DATE:      24 May 2022

CLOSING TIME:       12h00: Bids will be opened in the Council Chambers or Supply Chain Management Boardroom. Due to Covid-19 restrictions, opening of tenders                                       to the public will not take place, but the opening register will be posted on the municipal website, immediately thereafter.

CIDB :                     Class of Construction Works: 3EP or higher.

 INFORMATION:

Tender Specifications:                  Bian Vermaak at 021 914 0300; bian@lyners.co.za

SCM Requirements:                      Gerald Kraukamp at 021 808 8519 Gerald.Kraukamp@stellenbosch.gov.za

Office hours for collection:           08h00-15h30

Due to the rapid tender process, no clarification meeting with representatives of the Employer will be held for this tender

Local production and content are applicable to this bid. Bidders must use the exchange rate published by the South African Reserve Bank (SARB) at 12:00 on 17 May 2022. The guidance document for the calculation of local content is included in the bid document and is also available on the municipality’s website by following the Supply Chain Management link. If raw material or input to be used for a specific item is not available locally, bidders should obtain written authorisation from the dti should there be a need to import such raw material or input. A copy of the authorisation letter must be submitted together with this tender document at the closing date and time of bid. Please note that the requirements in terms of local content are fully obtained in the tender document.