Vendor List: Prepaid electricity 2021 0.00 KB 1475 downloads

...
Icon

Pniel/Groot Drakenstein Electricity Supply interruption 75.71 KB 1857 downloads

Due to maintenance work being conducted, electricity supply will be interrupted on 18 March 2021 from 09:00 - 16:00. Supply may be restored within a shorter period. ...
Icon

Interruption in Electricity Supply - Enkanini Electrification Project 334.28 KB 12716 downloads

The municipality is ready to commence with Phase 2 of the Electrification of Enkanini Project, but cannot continue until illegal connections are removed. 243 Houses were electrified last year as part of Phase 1 of the project. The Stellenbosch Municipality will be disconnecting illegal electricity connections in Enkanini from Tuesday, 16 March 2021 in order for work to commence on Phase 2. ...
Icon

NOTICE: Load control switches being installed 91.58 KB 6744 downloads

Stellenbosch Municipality is currently implementing a Residential Load Control project whereby every residential household within earmarked areas of Franschhoek (excluding those with fitted and working heat pump and solar panel solutions) must receive a geyser switching device which will control geysers during peak time to relieve the load on the national electricity grid. ...
Icon

NOTICE: Interruption in electricity supply (Wednesday, 08 February 2021) 74.61 KB 2246 downloads

[NOTICE] Electricity supply will be interrupted in the following areas on Wednesday, 10 February 2021 for planned maintenance and repair work on the network: Meerlust Pniel Johannesdal Rhodes Fruit Factory Allee Bleue Wine Estate Soms Delta Wine Estate Date: 10 February 2021 Time: 09h00 – 16h00 ...