Icon

APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION (SSEG) [Stellenbosch Municipality - WC024] 570.99 KB 7944 downloads

Completed and signed application form must be submitted to; Infrastructure Services Directorate, Ecclesia Building, 1st Floor, 71 Plein Street, Stellenbosch, 7600 or via email: engineering.services@stellenbosch.gov.za. Telephone: 021 808 8343/8215/8957 ...
Icon

Municipal Notice 19 - 2023 36.68 KB 360 downloads

...
Icon

Notice Parks, Open Spaces 2023-02-06 61.94 KB 427 downloads

...
Icon

Municipal Notice 17/2023 42.05 KB 238 downloads

...
Icon

Municipal Notice 16/2023 76.36 KB 624 downloads

...
Icon

REQUEST TO REDUCE WATER USAGE DUE TO THE EFFECTS OF LOAD SHEDDING 185.67 KB 1366 downloads

REQUEST TO REDUCE WATER USAGE DUE TO THE EFFECTS OF LOAD SHEDDING Stellenbosch Municipality calls for reduced water usage due to the effects of load-shedding. With continued high stages of load shedding, Stellenbosch Municipality’s water supply operations are being affected, in spite of the contingency measures. An appeal is herewith made to residents to reduce water usage to mitigate the effect of load shedding. The longer we have to contend with load shedding, the greater the potential impact on our infrastructure, in spite of our best efforts. We therefore call on residents and businesses to please be extra mindful of their water use over this time. While we have to be water-wise at all times, load-shedding is an added complication that requires even more resolve. Flushing during load shedding puts an inordinate strain on infrastructure which was never designed to be turned on and off...
Close Search Window