As part of the municipality’s plans of reducing our reliance on Eskom and co-generating electricity in a sustainable manner, the municipality has appointed a service provider to install solar panels at several municipal properties including the Van Der Stel Sport Grounds, Stellenbosch Town Hall, administrative buildings, Beltana depot and Traffic Department. Work will commence on 14 March 2022 and should be concluded by the end of June 2022.
- Posted
- 10 March 2022
- Category
- Electricity, Engineering, Notices
Files
-
Download (opens in a new tab)
NOTICE-22 2022-VAN-DER-STEL-SPORTSGROUNDS
-
Download (opens in a new tab)
NOTICE-21 2022-STELLENBOSCH-TOWN-HALL-ADMIN-BUILDING-COUNCIL-CHAMBERS-AND-KITCHEN
-
Download (opens in a new tab)
NOTICE-20 2022-BELTANA-DEPOT-STORES-BUILDING-AND-EXTERNAL-SHED
-
Download (opens in a new tab)
NOTICE-19 2022-TRAFFIC-DEPARTMENT-TEST-CENTRE-AND-ADMIN-BUILDING
More in Electricity
6 documents
- Download: Notice_98_26_DISCONNECTION of Electricity Supply to Premises: Rietenbosch School, Fir-, Fontein-, Wilger-, Kloof Streets and the Upper Part of Primrose Street as Well as a Part of Long Street (Cloetesville) (opens in a new tab)
- Download: Notice_97_26_DISCONNECTION of Electricity Supply to Premises: Papegaai-, Herold- and Stasie Streets (Town) (opens in a new tab)
- Download: Notice_96_26_DISCONNECTION of Electricity Supply to Premises: Blom- and Bird Street (Town) Date: Monday, 29 June 2026 (opens in a new tab)
- Download: Notice_94_26_DISCONNECTION of Electricity Supply to Premises: Lovel-L, Keifer-, Woltemade-, Formosa- En Swellengrebel Streets (Die Boord) (opens in a new tab)
- Download: Notice_93_26_DISCONNECTION of Electricity Supply to Premises: Weltevreden Hills Estate (opens in a new tab)
- Download: Request for Expression of Interest: Independent Power Producer and Battery Energy Storage Procurement Programme (opens in a new tab)