As part of the municipality’s plans of reducing our reliance on Eskom and co-generating electricity in a sustainable manner, the municipality has appointed a service provider to install solar panels at several municipal properties including the Van Der Stel Sport Grounds, Stellenbosch Town Hall, administrative buildings, Beltana depot and Traffic Department. Work will commence on 14 March 2022 and should be concluded by the end of June 2022.
- Posted
- 10 March 2022
- Category
- Electricity, Engineering, Notices
Files
-
Download (opens in a new tab)
NOTICE-22 2022-VAN-DER-STEL-SPORTSGROUNDS
-
Download (opens in a new tab)
NOTICE-21 2022-STELLENBOSCH-TOWN-HALL-ADMIN-BUILDING-COUNCIL-CHAMBERS-AND-KITCHEN
-
Download (opens in a new tab)
NOTICE-20 2022-BELTANA-DEPOT-STORES-BUILDING-AND-EXTERNAL-SHED
-
Download (opens in a new tab)
NOTICE-19 2022-TRAFFIC-DEPARTMENT-TEST-CENTRE-AND-ADMIN-BUILDING
More in Electricity
244 documents
- Download: 20191105 NOTICE 100_2019 (opens in a new tab)
- Download: 20191025 Notice Heuningboom Waboom Blinkblaar Elec Interruption 5 Nova (opens in a new tab)
- Download: 20191025 Notice Elec Stellita Park Gabriels St 30 Oct 2019a (opens in a new tab)
- Download: 20191025 Notice Elec Interruption Kromrivier Faure Botha Jcelliers Voorpleini 17 Nova (opens in a new tab)